go to jove.com

HIGH SCHOOL

Engineering

Concept Videos

Civil Engineering

This is a free preview. For full access

Leveling

Surveying Fill Heights for an Embankment

Description

Surveying fill heights for a roadway embankment helps keep the structure level on uneven ground. Surveyors use a leveling instrument and a staff to measure ground elevations and work out how much fill is needed at each point along the embankment line. This supports stability and proper drainage.

...

Transcript

A roadway embankment is planned across uneven ground, requiring a height of 3 meters above the current surface with a gradual slope.

To begin, set up a leveling instrument near a benchmark with a known elevation and record the backsight reading to establish the instrument's height.

Tags

Embankment LevelingLeveling InstrumentGround ElevationFill Material CalculationBacksight ReadingForesight ReadingTemporary BenchmarkSurveying MethodsElevation ControlRoadway Construction