8.11
表面积与体积之比较小的混凝土构件在浇铸混凝土构件之前,可通过给模具上油和润湿来养护。这些模具可以长时间留在原处以防止水分流失,如果由适合润湿的材料制成,则可以润湿。如果模具被提前拆除,则混凝土构件将被润湿并用聚乙烯薄膜覆盖以保持水分。对于暴露在干燥天气下的大型水平混凝土表面,应在表面上方悬挂临时覆盖…
在浇筑混凝土之前对模板进行涂油和润湿,有助于养护表面积与体积比较小的混凝土构件。
这些模板若为木质,可保留一段时间并保持湿润;若提前拆除,则需对混凝土进行洒水并用聚乙烯薄膜覆盖。
在干燥天气条件下,新浇筑的大面积水平混凝土表面需在混凝土初凝前覆盖防护层,随后进行湿养护。
使用喷嘴系统喷洒或喷雾水,或对混凝土表面进行蓄水或淹水处理,有助于潮湿养护。
或者,用湿润的锯末或稻草覆盖混凝土,或使用湿麻布、湿棉垫等饱和保水材料覆盖,这些材料需定期洒水,或在其上覆盖聚乙烯薄膜,以确保水与混凝土的接触。
在混凝土表面施加不透水膜可减少水分蒸发,但同时会阻止水分渗入。这些不透水膜可由防水纸、塑料薄膜或成膜型密封化合物制成,可通过人工涂抹或喷涂方式施加于潮湿的混凝土表面。
混凝土实验室试件的养护通过将其浸入水中实现。
View the full transcript and gain access to JoVE Core videos
Q1: Why should concrete forms be oiled and moistened before pouring?
Oiling and moistening forms before pouring concrete aids in curing concrete members with a small surface-to-volume ratio. This preparation helps prevent moisture loss from the freshly cast concrete and facilitates easier form removal. Proper form conditioning ensures better moisture retention during the critical early curing period.
Q2: What are the main methods for wet curing concrete surfaces?
Wet curing concrete is achieved through spraying or fogging water using nozzle systems or by ponding and flooding concrete surfaces with water. Alternatively, covering concrete with moistened sawdust, straw, or saturated moisture-retaining fabrics like wet hessian or cotton mats maintains water-concrete contact. These methods ensure continuous moisture availability during the curing process.
Q3: How do impervious membranes affect concrete curing?
Impervious membranes made of waterproof papers, plastic sheets, or membrane-forming sealing compounds minimize moisture evaporation from concrete surfaces. However, these membranes prevent moisture ingress and cannot replace moisture lost through self-desiccation. They are applied manually or sprayed onto damp concrete to reduce surface water loss.
Q4: What should be done if concrete forms are removed early?
If concrete forms are removed early, the concrete must be moistened and covered using polyethylene sheets to maintain moisture content. This protective covering prevents rapid evaporation and ensures adequate hydration during the critical curing phase. Early form removal requires immediate protective measures to preserve concrete quality.
Q5: How are large horizontal concrete surfaces protected during curing in dry weather?
A temporary covering is suspended above freshly laid large horizontal concrete surfaces exposed to dry weather until the concrete sets. After the concrete hardens, wet curing is initiated using spraying, fogging, or ponding methods. This staged protection prevents rapid moisture loss during the vulnerable initial setting period.
Q6: Why is immersion in water used for laboratory concrete specimens?
Immersion in water is the standard curing method for laboratory test specimens of concrete because it provides complete and uniform moisture saturation. This method ensures consistent hydration conditions and allows accurate measurement of concrete properties under controlled curing environments. Water immersion represents ideal curing conditions for standardized testing.
Q7: Can wooden forms be left in place during concrete curing?
Yes, wooden forms can be left in place for a prolonged period and periodically wetted to prevent moisture loss from the concrete. Keeping forms in place protects the concrete surface and maintains moisture content during curing. If forms are made of suitable materials, they can be an effective moisture-retention strategy.