27.9
A bund is proposed across a small valley to store stormwater. The area of land that will be submerged upstream after construction is determined using capacity contours.
Capacity contours represent the contour lines that outline the extent of water spread at a specific water level in the bund.
Based on the proposed bund height and the valley's topography, the engineers estimate the high flood level.
First, the engineers determine the location of the bund and set a specific height for the high flood level.
The engineers place a leveling instrument and determine the staff reading for the high flood level. Then, the same staff reading is marked along the valley on the upstream side at fixed distances apart.
At the selected high flood level, the capacity contours extend into the nearby dwelling area, indicating that the locality would be flooded if the bund height remains as proposed.
To ensure safety, the engineers should lower the bund height and recheck the capacity contours. At this height, the water would remain at a safe distance from the nearby dwelling area.
洪水风险评估涉及仔细的规划和分析,以确保蓄水结构附近社区的安全。容量轮廓线是此过程中的重要工具,因为它们说明了给定区域内特定水位的潜在水流扩散。在建造横跨小山谷的堤坝时,这些轮廓线在评估附近住宅区的安全方面发挥着关键作用。
在此示例中,堤坝旨在储存山谷中的雨水。工程师首先确定拟建堤坝的位置并确定预期…