28.10
Consider that a civil engineer has to plot a simple horizontal curve with a 200-meter radius and a 20-degree intersection angle in the field.
The engineer uses the method of perpendicular offsets from the long chord to plot the curve.
First, the long chord length is calculated as 69.46 meters, and the intervals for perpendicular offsets are set at 3 meters.
Next, the offset expression at the midpoint is used to determine the ordinate of the long chord’s center, and to ensure accuracy, this value is verified against the middle ordinate of the curve.
The engineer marks the long chord of the curve on the ground, and the points at 3-meter intervals along both sides of the midpoint are marked.
Then, the expression for the offset distance is used to calculate the perpendicular offsets, which are marked along the long chord at the corresponding points.
Finally, the engineer connects the top ends of the perpendicular offsets to form the curve.
使用现场数据设计和绘制曲线需要精确的计算和执行。使用长弦垂直偏移方法绘制一条半径为 200 米、交角为 20 度的平曲线。长弦横跨曲线的端点,计算长度为 69.46 米。为了保持绘图的准确性,沿弦选择 3 米的间隔进行分隔。
工程师使用偏移公式确定每个间隔的偏移距离。在弦的中点,计算纵距并根据曲线的…
版权所有 © 2026 MyJoVE Corporation。保留所有权利。