Correcting traverse angle errors is an important step in site surveying. In a four-sided traverse, the internal angles must add up to 360 degrees. Survey data first showed a total of 359 degrees and 48 minutes, which was 12 minutes short of the expected sum. That gap pointed to a likely measurement error from fieldwork.
The correction was made by spreading the 12-minute shortfall evenly across the four internal angles. Three minutes were added to each angle, and the values were recalculated.