This is a free preview. For full access
Bleeding Water and Laitance in Fresh Concrete
Description
Bleeding in fresh concrete happens when water from the mix rises to the surface after placement. The solid parts of the mix do not hold all the water as they settle, so separation occurs and water collects on top. Engineers can measure the severity of bleeding by checking total settlement or by noting how much the concrete h...
Show More
Transcript
If water from the concrete mix rises to the top of the newly laid concrete, it is bleeding. The cause is the mix's solids failing to retain all water as they settle.
The extent of bleeding is quantifiable by measuring the total settlement or the decrease in height per unit height of concrete.
Sometimes, rising water gets trapped be...
Show More