1. General procedure for carrying out a reaction under an inert atmosphere
2. Basic design and set up of Schlenk line.
The design of Schlenk lines varies from lab to lab but the key features are the same. Figure 1 shows a schematic set up of the Schlenk line with key features pointed out.

Figure 1. Schematic set up of a Schlenk line.
The dual manifold consists of two parallel glass tubes, which form the main body of Schlenk line. A gas manifold is connected to the inert gas supply and a vacuum manifold is connected to the vacuum line, which allows switching between inert gas and vacuum by tuning the taps. The gas exits the manifold through a visible oil bubbler in order to monitor the flow of the gas. The vacuum manifold is closed at one end and the other end is connected to a cold trap and a vacuum pump. The cold trap is used to prevent volatile or corrosive solvents from damaging the pump.
3. Safety concerns with Schlenk line.
Robert M Rioux, Ajay Sathe, Zhifeng Chen, Pennsylvania State University, University Park, PA
The use of reagents sensitive to oxidation or moisture ne…
Chapters in this video
0:04
Overview
2:31
Setting up the Schlenk line
4:01
Operation of the Schlenk line
6:45
Summary