1. Starting up the apparatus
The apparatus is primarily operated through the distributed control system interface. A Perm P&ID schematic appears and opening/closing automated valves is point and click.
2. Conducting Two-Phase Flow Pressure Drop Experiments
Be sure that the water valves to the beds are closed, the inlet and exit valves to bed #5 are open, the drain valve is open, and that the manual valve for the air to the beds is closed.
Source: Kerry M. Dooley and Michael G. Benton, Department of Chemical Engineering, Louisiana State University, Baton Rouge, LA
The goal of this experi…
Chapters in this video
0:07
Overview
1:08
Principles of Flow in a Packed Bed
4:14
Reactor Start-up
5:15
Tracer Test
6:09
Two-phase Flow Experiment
7:26
Data Processing and Results
8:50
Applications
10:20
Summary