The slump test measures concrete workability and uses a 12-inch high truncated cone mold, narrowing from eight inches at the base to four inches at the top, securely attached to a flat base before the concrete is filled.
The concrete is added to the dampened mold in three layers, each compacted 25 times using a steel tamping rod with a five-eighths-inch diameter and rounded end. Finally, the top surface is struck off.
After filling, the cone is gently lifted, and the concrete slumps. This decrease in its height, called a slump, is measured to the nearest quarter inch.
A uniform slump is called a true slump, while concrete that slides down the mold indicates a shear slump, which requires retesting. Persistent shear slump suggests the mix lacks cohesion.
Sometimes, the concrete may collapse for lean mixes, which highlights the slump test's unreliability for lean mixes.
Slump, either too high or too low, serves as an immediate alert, prompting correction of the issue with the mix in bulk concreting. Recommended slump values for different workabilities are predetermined.
The slump test is a widely used method to measure the workability of concrete. It employs a 12-inch high truncated cone mold that tapers from eight inches at the base to four inches at the top. Before testing, the mold is securely attached to a flat base and dampened.
Concrete is poured into the mold in three layers to conduct the test. Each layer is compacted 25 times with a steel tamping rod, which has a five-eighths-inch diameter and a rounded end, to ensure even distribution and eliminate air pockets. After compacting, the top surface of the concrete is leveled off.
Once the mold is filled, it is gently lifted upward, allowing the concrete to slump downward due to gravity. The decrease in height of the concrete, referred to as the slump, is then measured to the nearest quarter inch. A proper slump, where the concrete maintains its conical shape, is a true slump. If the concrete collapses or spreads out, indicating a shear slump, the test may need to be repeated as it suggests the mix lacks cohesion and could be problematic for structural applications.
Excessively high or low slump values are indicators of potential issues in the concrete mix, requiring adjustments. The slump test is particularly effective for identifying the immediate need for corrections in bulk concreting operations, although it may be less reliable for lean mixes where the concrete tends to collapse. Recommended slump values are predetermined based on the specific requirements for different types of workability.
The slump test measures concrete workability and uses a 12-inch high truncated cone mold, narrowing from eight inches at the base to four inches at the top, securely attached to a flat base before the concrete is filled.
The concrete is added to the dampened mold in three layers, each compacted 25 times using a steel tamping rod with a five-eighths-inch diameter and rounded end. Finally, the top surface is struck off.
After filling, the cone is gently lifted, and the concrete slumps. This decrease in its height, called a slump, is measured to the nearest quarter inch.
A uniform slump is called a true slump, while concrete that slides down the mold indicates a shear slump, which requires retesting. Persistent shear slump suggests the mix lacks cohesion.
Sometimes, the concrete may collapse for lean mixes, which highlights the slump test's unreliability for lean mixes.
Slump, either too high or too low, serves as an immediate alert, prompting correction of the issue with the mix in bulk concreting. Recommended slump values for different workabilities are predetermined.
From Chapter 6:
Now Playing
Fresh Concrete
2.6K Views
Fresh Concrete
1.8K Views
Fresh Concrete
460 Views
Fresh Concrete
2.0K Views
Fresh Concrete
2.1K Views
Fresh Concrete
847 Views
Fresh Concrete
1.1K Views
Fresh Concrete
1.3K Views