Short Patch Ber

Short-patch base excision repair (BER) is a DNA repair pathway that corrects small, non-helix-distorting lesions affecting individual bases, helping preserve genome stability. A DNA glycosylase first removes the damaged base, creating an abasic site; an apurinic/apyrimidinic endonuclease then cuts the DNA backbone, DNA polymerase inserts a single replacement nucleotide, and DNA ligase seals the remaining nick. This coordinated process repairs common forms of oxidative, alkylation, and deamination damage without replacing an extended DNA segment. Studying short-patch BER clarifies how cells prevent mutations and provides a foundation for investigating genome maintenance, disease mechanisms, and responses to DNA-damaging agents.

Short Patch Ber - Related Videos

Education

JoVE Core - Molecular Biology
Free Sample

Long-patch Base Excision Repair

0 Views •

2020

Since the discovery of the two BER pathways, there has been a debate about how a cell chooses one pathway over the other and the factors determining this selection. Numerous in vitro experiments have pointed out multiple determinants for the sub-pathway selection. These are: Lesion type: Depending on the type of base damage, a specific DNA glycosylase - mono or bifunctional, is recruited to the damaged site. While the sequential action of a monofunctional glycosylase favors long patch repair...

Education

JoVE Science Education - Advanced Biology

Patch Clamp Electrophysiology

0 Views •

2023

Neuron cell membranes are populated with ion channels that control the movement of charge into and out of the cell, thereby regulating neuron firing. One extremely useful technique for investigating the biophysical properties of these channels is called patch clamp recording. In this method, neuroscientists place a polished glass micropipette against a cell and apply suction to form a high resistance seal. This process isolates a small “patch” of membrane that contains one or more ion channels.

Short run

0 Views •

2024

The short run is defined not by a fixed timeframe, but by the condition in which at least one input in the production process remains fixed. The input whose quantity cannot be changed is called the fixed input. The input whose quantity can be changed is called the variable input. When all inputs can be changed, the time frame becomes the long run. Typically, the fixed input is capital, such as machinery or the physical size of a production facility, which cannot be easily or quickly changed. In...

Research

JoVE Journal - Medicine

Patch Angioplasty in the Rat Aorta or Inferior Vena Cava

0 Views •

Cited by 16 •

2017

We have established a model of pericardial patch angioplasty that can be used in either small-diameter veins or arteries. This model can be used to compare venous and arterial neointimal hyperplasia formation.

A Computer-assisted Multi-electrode Patch-clamp System

0 Views •

Cited by 49 •

2013

Multi-electrode patch-clamp recordings constitute a complex task. Here we show how, by automating of many of the experimental steps, it is possible to accelerate the process leading to qualitative improvement in performance and number of recordings.

View All Results

FAQs

Related Topics