Schlieren Imaging: A Technique to Visualize Supersonic Flow Features
0 views·07:34 min
1. Visualizing shock waves using a schlieren imaging system
Activate the dryer towers to dehydrate the air. This will ensure that the air flow does not contain moisture, and will prevent ice formation when the local temperature in the test section drops due to the supersonic flow.
Open the test section and secure the 15° half-angle cone model to the support structure.
Check if the test section is clear of debris or other objects, then close test section.
Make sure the main valve for air flow control is closed, then turn on the compressor to pressurize the air storage tank. Allow the compressor to reach 210 psi before shutting it off.
Turn on the controller for the high-speed valve and set the following parameters that are listed in Table 1.
Table 1: Control parameters for Mach 2 run.
PL
0
ΔMV
25
ΔPV
100
DVL
100
DF
0.25
KP
1.1
LC
OFF
Ti
0.01
RH
100
Td
0
RL
0
Rt
1
PV
--
BS
0
CV
--
ΔT
1
SV
17
D/R
REV
MV
-25
VD
REV
MODE
A
MVF
-25
MH
100
PH
100
ML
0
Turn on the light and cooling fan of the schlieren imaging system.
Place a piece of paper on the opposite side of the text section from the light source.
Align the first concave mirror to allow light to pass through the test section. Check that the light hits the paper.
Adjust the second concave mirror so that the light that passes through the test section is reflected onto a projecting screen.
Adjust the knife-edge so that it is at the focal point of the second mirror. And adjust the aperture of the knife-edge to achieve the desired image quality.
Position a camera on a tripod directly in front of the knife-edge aperture to record the projected image.
Put on the appropriate hearing protection, and check that no one is near the air exhaust located outside the building.
Open the air supply to the fast-valve controller, then open the main valve that lets air into the system.
Turn off the light in the room so the projected image is easier to see.
Activate the wind tunnel.
Observe the schlieren image of the Mach 2 flow over the cone model.
Turn off the wind tunnel by closing the valves in reverse order. Then turn off the controller.
Wait until all air has been released from the apparatus before removing your hearing protection.
Source: Jose Roberto Moreto, Jaime Dorado, and Xiaofeng Liu, Department of Aerospace Engineering, San Diego State University, San Diego, CA